HME replaced timber piles with steel at Longview Dock 1, ensuring structural integrity and safe operations.
HME was contracted by NW Alloys to perform critical dock maintenance and pile replacement at Longview Dock 1. This project involved removing and replacing over 50 aging timber piles with modern steel alternatives, ensuring the structural integrity of the dock and its continued safe operation. The maintenance was essential to support ongoing industrial marine operations and extend the dock's service life.
The project required precision pile driving, demolition, and construction, while adhering to environmental and operational compliance standards to minimize downtime for ongoing facility operations.
HME’s work on Longview Dock 1 demonstrates our expertise in pile driving, dock maintenance, and industrial marine construction. By executing this project with precision and efficiency, HME helped ensure the facility remains a safe, reliable, and structurally sound part of Longview’s marine operations for years to come.